CLIO
Make an AI agent for your science
CLIO handles the groundwork of scientific data: reading your files, running analyses and simulations, and tracking where every result came from. Plugins add what your lab knows, so the agent works the way your field does.
Free and open source for Windows, macOS and Linux.
One agent
So many agents. Why not one?
An agent for chemistry, another for genomics, another for materials, each built from scratch and none aware of what the others found. In CLIO they share one foundation, the same way of reading data, running work and keeping evidence, and each field adds its knowledge as plugins. A microscopy lab and a simulation group can work in the same place and share what they find.
What CLIO can take on
From one question about a few records to a run where several specialists work at once. Each clip shows one of them in the app.
curl -fsSL https://clio.iowarp.ai/desktop.sh | bashAsk your data
Select observations on a map, chart or table and ask about exactly those records. CLIO reads them, works out the answer and shows which records it used.
Working with resultsCLIO doing science
Captures from CLIO sessions in different fields. Each one shows what CLIO did and links to the guide that explains how.


Earth science
GNSS stations on a globe
CLIO put 178 EarthScope GNSS stations across Cascadia on a globe, linked to a table of the stations. Pick a station in either one and the other follows.
Apps in a dashboardPlugins
Bring what your lab knows
Your instruments, your file formats, the way your group runs an analysis. Put them in a plugin and CLIO works the way your lab does. Add the plugins your work needs, share them with colleagues, and remove one to take it away again.
Where CLIO runs
On your computer
A desktop app for Windows, macOS and Linux that works next to your files.
DownloadOn a lab server
Run it on a server or a cluster you already use and open it from your browser.
Install optionsWith your model
Use a hosted model or one your institution runs. You decide which.
Choose a modelIn the open
The code is on GitHub. Read it, change it and share the plugins you build.
GitHub
Download CLIO
Windows
Windows 10 and 11 (x64; ARM through emulation)
macOS
Apple Silicon
Intel Mac? Install from a terminal
Linux
x86_64 and aarch64. Choose your distribution.
- Ubuntu 22.04+, Debian 12+, Mint 21+.deb
- Fedora, openSUSE.rpm
- Arch, Manjaro, EndeavourOSArch package
- RHEL, Rocky, AlmaLinux 9Use CLIO in your browser
Web, server and Docker
For servers, HPC login nodes, containers and systems without the desktop app.
- In your browserInstalls the service. Run clio to open it.
curl -fsSL https://clio.iowarp.ai/install.sh | bash - Docker with WebThen open localhost:8080.
docker run --rm -p 8080:80 ghcr.io/iowarp/clio-web:latest - Headless agentThe agent API on port 8100, for scripts and other clients.
docker run --rm -p 8100:8100 ghcr.io/iowarp/clio-api:latest
Install script and Docker images in the docs.
What's new
All versionsA browser you share with CLIO
Open a page beside the conversation, pin a comment on any part of it and CLIO reads the page with you.
Live data and dashboards
Follow a stream of observations and keep a dashboard updating while you ask about it.
Long work in the background
Start a long run, keep talking and come back to its results when it finishes.
Plugins and flows
Shape an agent for your kind of work with plugins, and write procedures it can run step by step.
A science log tied to evidence
Claims, results and the evidence behind them are kept together as the work goes on.
Try it on your own data
Install CLIO, open a folder from your project and ask the question you would ask a colleague.














